Project: Esporta - RBC Gym refurbishment
Client: Esporta Health ClubValue: £200,000
Duration: 7 weeks (Three phases)
Role: Main Contractor
This was a phased operational refurbishment that required close communication with the operational team to ensure the success of the project.
The project included the construction of Spinning and Holistic studios, the reconfiguration and refurbishment of the gym over three phases and two levels, keeping two thirds of the gym operational at any one time.